Engineer sails with the vessel for 5 to 6 days and performs a complete health analysis.

The analysis includes


  • Vibration and shock pulse data measured from all machinery. On the spot analysis and interpretation of results.
  • Thermo-graphic inspection of all electrical and some critical mechanical systems.
  • Pressure and vacuum leak detection using passive ultrasonic frequency methods.
  • Thickness measurement of critical machinery systems.
  • Main and auxiliary engines performance test and power balance analysis.
  • Detailed machinery health assessment report.